Order decision table
| Quotation item | What to confirm | Why it affects the order |
|---|---|---|
| Product scope | Model, diameter, lead, quantity, accuracy | Prevents comparing different specifications. |
| Machining scope | End machining, support model, nut style | Controls production work and fit risk. |
| Packing scope | Rust prevention, labels, carton marks, wooden case | Separates product cost from export protection. |
| Delivery scope | Lead time start point, destination, shipment photos | Clarifies when production and shipping responsibility starts. |
End machining and nut scope
If the quotation covers end machining, confirm the fixed side, the supported side, bearing journals, lock nut thread, keyway, coupling end and support unit model. Nut style, flange direction, preload or clearance should also be written into the quotation.
Packing and delivery boundaries
Packing should state rust prevention, carton, hard tube, wooden case, labels, carton marks and whether shipment photos are provided. Lead time should state whether it starts from order confirmation, payment received or drawing approval, so both sides read it the same way.
Confirm changes before payment
If quantity, length, accuracy, packing or shipping changed after the quotation, ask for an updated quotation. Using one confirmation checklist before payment reduces disputes during production and shipment. See how to confirm quotation validity and payment terms.
Confirmation checklist
- Quotation version, model, quantity, diameter, lead, overall length, thread length, and accuracy.
- End machining, support unit, coupling end, nut direction, preload, backlash, and inspection report.
- Packing, labels, carton marks, rust prevention, shipment photos, and export document needs.
- Lead time, payment terms, freight responsibility, changed items, and the person giving final approval.
Send us the quotation you want to confirm
Send weimute the quotation, latest RFQ, and any changed items before payment. Our manufacturing and sales team can mark the differences and return a clear confirmation checklist before the order is released.
FAQ
Can two quotations with the same model still differ? Yes. Quantity, accuracy, end machining, packing, lead time, and inspection report can all change the real scope. See how to confirm quote validity and payment terms.
When should I ask for a revised quotation? Ask for reconfirmation whenever quantity, drawing, packing, destination, or delivery target changes.
Compare quotations with a scorecard
| Item | Suggested weight | Check |
|---|---|---|
| Model and dimensions | 30% | Do diameter, lead, length, and ends match? |
| Quality evidence | 20% | Are inspection points, photos, and report format clear? |
| Lead time and packing | 20% | Are lead time, case, rust prevention, and labels stated? |
| Commercial terms | 15% | Are payment, validity, and freight comparable? |
| Repeat order and support | 15% | How are revisions, replenishment, and issues handled? |
Send the scorecard and missing fields through the RFQ form, and review the quality control page.
Next step
Turn this guide into an RFQ
When the specification direction is clear, send the details below together with quantity, lead time, and packing requirements.
Include these details
- Model, length, quantity, purchase purpose, and target lead time.
- Drawing, sample photos, application parameters, or old-part dimensions.
- Packing, label, inspection, and quotation version to confirm before payment.


